Fair Play Barnet, opened at Victoria Recreation Ground in January 2024, is the UK’s first maximum accessibility and inclusive playground. The purposefully designed playground was born from a three-way collaboration between Barnet Council, expert parents and the Council’s play contractor, Kompan.
In early 2022, the Council was approached by a local resident who was keen to build a playground where people of all abilities could play together. The Council identified Victoria Recreation Ground as an ideal location due to its proximity to a leisure centre with essential supporting facilities such as Changing Places toilets, parking, and a café.
Co-designing with experts and users
The design process began with a thorough review of accessible and inclusive equipment available in the market. The team focused on compatibility, usability, and long-term maintenance. Parent expert Deborah Gundle, who has firsthand experience with accessibility issues through her disabled son, provided invaluable insights.
The initial designs were shared with various disability networks to garner feedback such as to include equipment for climbing and for multiple users to enjoy a shared experience. In a separate public consultation in 2023, a draft design of the playground and images of potential equipment were provided in the questionnaire, which was promoted widely to gather a wide range of views.
The consultation received 118 responses from professional experts, residents with disabilities, as well as parents and carers with a range of experience in different disabilities. The feedback was vital in informing the design, such as ensuring there would be one entrance and exit to ensure users will not leave unnoticed by their carers, and equipment that can be used by both children and adults.
Thoughtful design
The project team put together a matrix of the proposed equipment based on the age range it is suitable for, the type of movement it involves, its ease of use for individuals in wheelchairs or lying down, if it has back support, and if it could be enjoyed by multiple users simultaneously.
The team also considered other aspects of the space: solid safety surfacing for complete accessibility across the entire playground; differently coloured textured paths weaving through the play area to support the visually impaired in navigation; large picnic tables to allow three wheelchair users along with other people to be comfortably seated at any one time; and communication boards specially developed to be placed around the playground to facilitate non-verbal communication between users.
During the final stages of construction, the team tested the equipment from perspectives of a wheelchair user and an adult non-wheelchair user, adjusting the height of key elements and ensuring proper spacing under play panels for better wheelchair access, and placing the five communication boards at two different heights.
Key success factors and lessons learnt
The project began as an explorative effort, allowing the team to research and evaluate a range of equipment options without strict limitations. However, the project team found that it had to adopt a more focused approach and establish a project budget to deliver a playground on site.
A significant factor in the project’s success was the Council’s framework contract with Kompan, which allowed a playground contractor to be involved from the outset to evaluate the feasibility of the project.
The ability to purchase third-party equipment through the contract allowed the project team to consider a wider range of options. The use of standard, non-bespoke equipment also simplified maintenance, with no additional costs for repairs or parts replacement.
Collaboration was at the heart of the success of Fair Play Barnet. Each party brought unique perspectives and experiences, from the Council and Kompan’s experience in playground development to parents’ insights on accessibility. The team will continue working together to promote the playground and advocate for more inclusive play spaces.
Community impact
The £500,000 project was primarily funded by independent donors, with the Council contributing £100,000 and undertaking its future maintenance. Today, Fair Play Barnet is a popular space, used by a wide range of people, including special schools bringing their pupils during the day and parents and children using the space to meet up. The Council is exploring offering quiet times with supervision in response to community requests.
Fair Play Barnet not only sets a new standard for accessible playgrounds but also highlights the importance of community involvement and collaboration in creating inclusive public spaces. The playground’s success is a testament to what can be achieved when local authorities, parents, and contractors work together to create environments that welcome everyone.
Fair Play Barnet has enabled my son to interact with friends and family on an equal level. Powerchair users are often forgotten when parks say they are inclusive. Fair Play Barnet has ensured that he can swing, go on roundabouts, climb the slopes and seesaw – things he has not done since being confined to a wheelchair and too heavy for carers to lift him. Thank you for making this park truly inclusive to all.
This is life changing for me, I can come and meet parents of other children with disabilities.
Contacts
Deborah Gundle and Nathalie Esfandi
Fair Play / Expert Parents
fairplayinclusive@gmail.com
Barnet Council Greenspaces Team
parks@barnet.gov.uk
